Run-around loop No. 2 siding

Coordinator: Jon Tyler (jon.tyler1@gmail.com)

Last Updated: 2015-09-21 22:34:20

Following advice from our Independent Competent Person for Permanent Way a single catch point blade will be installed at each end of the loop line to protect the main line. The two sidings currently planned will then be taken off the loop.

Images

2015-01-28 18:30:41
Existing east turnout
2015-01-28 18:30:41
Catch point and siding turnout. Note that although two blades are shown only the outer blade will be fitted to the catch points.
2015-01-28 18:30:41
This is the location where a second siding can be created by installing another turnout.
2017-03-25 17:22:36
Siding turnout installation at the end of day 1.
2015-06-25 16:35:42
Two sets of turnout crossing timbers ready for fitting baseplates